Cooling Chiller

The cooling chiller are used to cool molds in plastic processing machinery and can greatly improve the surface finish of plastic products.

Reduce the surface marks and internal stress of plastic products so that the product does not shrink or deform.

It is convenient for plastic products to be molded out and accelerate product finalization, thus greatly improving the production efficiency of plastic molding machines.

Cooling Chiller Design Features

  1. World brand compressor and efficient condenser, evaporator combination, super cooling, energy saving, low noise, long life;
  2. Increase the evaporator and condenser, the unit can operate in a high temperature environment below 45 degrees;
  3. Microcomputer control, precise temperature control at ±1°C temperature difference;
  4. The advanced tank coil evaporator design not only can supply continuous and stable chilled water, but also can cool the water inside the tank, reduce the absorption of environmental heat, and improve the cooling energy efficiency;
  5. HTI-W water-cooled shell-and-tube condenser provides fast heat transfer and good cooling effect. It is suitable for high temperature and water-rich areas;
  6. HTI-A air-cooled finned condenser provides good heat dissipation, easy cleaning and maintenance, and easy installation.

More advantages about our blow molding machine:http://www.yankangmachine.com/technology-advantages/

TRAINNING
The buyer could dispatch their operators to the seller’s factory for training, including machine operation, maintenance & simple repairs;
Or against the requests of the buyer, the seller’s technician could train the buyer’s operators in the buyer’s factory in the periods of installing & adjusting;

INSTALLATION & ADJUSTMENT
The seller could dispatch an engineer against the requests of the buyer to install and adjust the machines for one week(free of charge) in the buyer’s factory. After one week,if the buyer still needs the training,$100 should be paid for the engineer.
The buyer should make a reservation in advance before delivery of the machines;
The buyer should pay for the engineer’s food & board while installation in buyer’s factory.And the buyer should also pay for the air ticket for the engineer.

GUARANTEE 
The guarantee time is one year after the machines normally works in the buyer’s factory, if only the problem is cause due to quality control or any reason by the seller. We will supply replaced parts free of charge and our engineers will guide you how to solve the problems.