Floating Dock Blow Molding Machine

floating dock blow molding machine

The floaitng pontoon can adapt to different water levels and is favored by more and more users. The designer will design the best buoy according to the influencing factors (such as ship type, water depth, tide, current, and wind wave size). The surface of the pontoon has a non-slip design, and planks can be laid as needed. While ensuring quality and safety, this is the most economical way to build a terminal.

Applications of Floating Pontoon Blow Molding Machine

The floating tank is made of high molecular polyethylene through large blow molding equipment. Can be used in floating docks, yacht docks, working platforms on the water, cage culture, floating bridges, and other fields.

Configuration of Floating Dock Blow Molding Machine

①Leading International Technology

For example:

Use original SIEMENS control systems. Guarantee high quality, safe and stable operation. At the same time, it provides after-sales international services.

For more advanced configurations, please refer to the following figure.

SR Description of Parts Brand Origin
1 PLC SIEMENS Germany
2 Touch Screen SIEMENS Germany
3 Inverter SIEMENS Germany
4 Screw Motor SIEMENS Germany
5 Air Switch SIEMENS Germany
6 Contactor SIEMENS Germany
7 SSR(Solid State Relay) CARLO GAWAZZI Switzerland
8 Wall Thickness Controller MOOG USA
9 Servo Valve YUKEN Japan
10 Hydraulic Valve YUKEN Japan
11 Solenoid Valve YUKEN Japan

 

②Multi-layers Die Head Technology

First, multi-layer mold design makes the wall thickness uniform and stable. Second,it can increase production efficiency by 5 times. Finally,the utilization rate of recycled materials increased by 4 times.

yankang blow molding machine die head technology

Customer Service

①Training
The buyer could dispatch their operators to the seller’s factory for training, including machine operation, maintenance & simple repairs;
Or against the requests of the buyer, the seller’s technician could train the buyer’s operators in the buyer’s factory in the periods of installing & adjusting;

②Installation & Adjustment
The seller could dispatch an engineer against the requests of the buyer to install and adjust the machines for one week(free of charge) in the buyer’s factory. After one week, if the buyer still needs the training,$100 should be paid for the engineer.
The buyer should make a reservation in advance before the delivery of the machines;
The buyer should pay for the engineer’s food & board while installation in the buyer’s factory. And the buyer should also pay for the air ticket for the engineer.

③Guarantee
The guarantee time is 1 year after the machines normally work in the buyer’s factory if only the problem is caused due to quality control or any reason by the seller. We will supply replaced parts free of charge and our engineers will guide you on how to solve the problems.

Get A Free Quote