PP Solar Tank Blow Molding Machine

solar inner blow molding machine

In order to ensure that the products are better adapted to the market and expand the market scale, the Yankang team continues to meet the challenges and continue to innovate and improve the blow molding machine technology.

On this basis, new blow-molded new products have been developed, such as canoes, septic tanks, mobile toilets, floating solar, floating dock and PP solar tank blow molding machine,s and so on.

Applications of Solar Tank Blow Molding Machine

solar-tank

Configuration of Solar Tank Blow Molding Machine

①Leading International Technology

For example:

Use original SIEMENS control systems. Guarantee high quality, safe and stable operation. At the same time, it provides after-sales international services.

For more advanced configurations, please refer to the following figure.

SR Description of Parts Brand Origin
1 PLC SIEMENS Germany
2 Touch Screen SIEMENS Germany
3 Inverter SIEMENS Germany
4 Screw Motor SIEMENS Germany
5 Air Switch SIEMENS Germany
6 Contactor SIEMENS Germany
7 SSR(Solid State Relay) CARLO GAWAZZI Switzerland
8 Wall Thickness Controller MOOG USA
9 Servo Valve YUKEN Japan
10 Hydraulic Valve YUKEN Japan
11 Solenoid Valve YUKEN Japan

 

②Multi-layers Die Head Technology

First, multi-layer mold design makes the wall thickness uniform and stable. Second,it can increase production efficiency by 5 times. Finally,the utilization rate of recycled materials increased by 4 times.

yankang blow molding machine die head technology

Customer Service

①Training
The buyer could dispatch their operators to the seller’s factory for training, including machine operation, maintenance & simple repairs;
Or against the requests of the buyer, the seller’s technician could train the buyer’s operators in the buyer’s factory in the periods of installing & adjusting;

②Installation & Adjustment
The seller could dispatch an engineer against the requests of the buyer to install and adjust the machines for one week(free of charge) in the buyer’s factory. After one week, if the buyer still needs the training,$100 should be paid for the engineer.
The buyer should make a reservation in advance before the delivery of the machines;
The buyer should pay for the engineer’s food & board while installation in the buyer’s factory. And the buyer should also pay for the air ticket for the engineer.

③Guarantee
The guarantee time is 1 year after the machines normally work in the buyer’s factory if only the problem is caused due to quality control or any reason by the seller. We will supply replaced parts free of charge and our engineers will guide you on how to solve the problems.

Get A Free Quote